You have
Food Safety Program
Food Safety Program
- Agencies that Oversee Special Food Processes
- Easy Steps for Healthy Food Service
- Food Handler Card
- Food Safety Manager Certification
-
- Trucks & Trailers
- Carts
- Mobile Food Permit
- Certified Commercial Kitchens
- Summary of mobile food facility regulations
- Frequently Asked Questions
- Mobile Food Facility Plumbing Diagram Limited
- Mobile Food Facility Plumbing Diagram Lmited large
- Muestra del diagrama de plomeria para unidad Limitada movil
- Mobile Food Facility Plumbing Diagram
- Muestra del diagrama de plomeria para unidad movil
- Mobile Food Facility Plumbing Diagram large
- Muestra del diagrama de plomeria para unidad movil grande
- Muestra del diagrama de plomeria para unidad movil Limitada grande
- Temporary Food Facility Permit for Community Events
- Food Facility Drawing Designers
- Pet Dogs in Outdoor Dining Areas
- Food Safety Guidelines During a Power Outage
- Food and Water Safety During and After a Flood
- Cal-code Article 4 Handwashing
- Flooring Guidelines
- Air Balance Testing Companies
- Food Facilities with Private Water Wells
- Minimal Preparation Operational Requirements
- Moderate Preparation Temporary Food Facility Operational Requirements
- Minimal Preparation Temporary Food Facility Operational Requirements
- Extensive Preparation Temporary Food Facility Operational Requirements
- Grease Trap Oversight Jurisdictions
- Food Facility Drawing Requirements
- Temporary Food Facility Definitions and Operating Requirements
- Guidance to Community Events for Wineries and Breweries
- Farmers Market Food Permit
- Cottage Food Operations (CFO's)
- Water Heater Guidelines and Worksheet
- Back to Food Safety Program
Food Facility Drawing Requirements
Your food facility drawing should include these elements:
- Scale: minimum of 1/4 inch = 1 foot.
- Square footage: include overall square footage, number of seats in dining room, bar and patio/outdoor dining.
- Site plan: include entire site with proximity to road, driveway, parking, building footprint, other structures/infrastructure and refuse enclosure.
- Floor plan: include entire facility with each room or area clearly identified, plumbing and electrical layouts, reflected ceiling plan, equipment layout details and equipment elevations, employee clothes storage location, storeroom location, and lighting location.
- Equipment schedule: table listing all equipment and page referenced on drawing.
- Finish schedule: table listing all materials and finishes for floors, floor bases, walls, ceiling, shelving and cabinets. Include type of material, surface finish, and brand name.
- Plumbing diagram: include complete layout with locations and connections of water heaters, toilets, and sinks.
- Exhaust hood diagram and worksheet (worksheet for custom-made units only)
- Grease trap/separator: Check with oversight jurisdiction to determine if a grease trap is needed. If it is determined that a grease trap is needed, include diagram with drawing.
- Sneeze guard diagram: include scale drawing and finish schedule for each sneeze guard.